Following a major fire incident, Caswell Adhesives a leading supplier of tailor-made adhesives, over the course of 8 months embarked on a massive £7m new facility.
‘Throughout the construction design stage we utilised as much space as possible to provide practical solutions to enable the company to grow. This resulted in an efficient production facility with ample storage and distribution space in a clear, logical and accessible layout.’
The new facility comprises over three principal parts: two storey administrative offices, a manufacturing zone and the warehouse. All three constituents are based on a steel frame and the external walls in brickwork at ground level with conventional cladding above.
The roof was laid using undulating steel panels. Internal partitions have been divided using traditional blockwork with a concrete floor slab and TIBMIX. Meanwhile, AI Process Systems installed a tank farm to accommodate four emulsion tanks and one powder silo allowing Caswell to buy and store materials in bulk.
|
|
|
|
|
|